Equipment for Air Bridge passenger ropeway
Standard solution for the length of 1000 m
2 cabs x 15 pers.
2 cabs x 15 pers.
2 cabs x 35 pers.
Air Bridge cabin with Air Bridge module
2
2
2
Capacity
2х15 pers.
2х15 pers.
2х35 pers.
Line
1
2
2
Track rope
2
2
4
Towers
2
2
2
Speed
4 m/s
4 m/s
4 m/s
Journey time
5 min
5 min
5,5 min
Daily capacity (12-hour workday)
2160 pers.
3060 pers.
6860 pers.
Possibility of cargo transportation
yes
yes
yes
Cargo capacity (option)
2х1 ton
2х1 ton
2х3 tons
IoT
yes
yes
yes
Equipment for Air Bridge passenger ropeway
Standard solution for the length of 5000 m
2 cabs x 15 pers.
4 cabs x 15 pers.
4 cabs x 35 pers.
Air Bridge cabin with Air Bridge module
2
4
4
Capacity
2х15 pers.
4х15 pers.
4х35 pers.
Line
1
2
2
Track rope
2
4
4
Towers
5
5
5
Speed
5 m/s
5 m/s
5 m/s
Journey time
18,5 min
19 min
19 min
Daily capacity (12-hour workday)
900 pers.
1830 pers.
4200 pers.
Possibility of cargo transportation
yes
yes
yes
Cargo capacity (option)
2х1 ton
4х1 ton
4х3 tons
IoT
yes
yes
yes
Equipment for Air Bridge passenger ropeway
Standard solution for the length of 10 000 m
2 cabs x 15 pers.
4 cabs x 15 pers.
4 cabs x 35 pers.
Air Bridge cabin with Air Bridge module
2
4
4
Capacity
2х15 pers.
4х15 pers.
4х35 pers.
Line
2
2
2
Track rope
4
4
4
Towers
10
10
10
Speed
5 m/s
5 m/s
5 m/s
Journey time
35 min
35 min
35,5 min
Daily capacity (12-hour workday)
570 pers.
1080 pers.
2660 pers.
Possibility of cargo transportation
yes
yes
yes
Cargo capacity (option)
2х1 ton
4х1 ton
4х3 tons
IoT
yes
yes
yes
The stated cost estimate is a preliminary estimate of the equipment that includes EXW shipping from Europe. The estimate doesn’t include costs related to engineering, logistics, construction and mounting. These costs will be worked out during a detailed breakdown of the project.
AIR BRIDGE PASSENGER ROPEWAY CONSTRUCTION STAGES
Approximate duration of the project of medium complexity: 1,5 years
1
Contract, pre-design
1 month
2
Design and engineering
6 months
3
Construction and mounting works, equipment delivery and mounting
10 months
4
Adjusting works and launch
1 month